Call Us Today 044 43168787
Email Us admin@premiersteels.in

Infrastructure

Premier Steel Components Pvt Ltd > Infrastructure
S.NO MAKE MODEL QTY YEAR OF MANUFACTURE
1 ACE MICROMATIC CNC LATHE ELITE 2 Nos. 2016
2 ACE MICROMATIC CNC LATHE J300 1 No. 2016
3 LMW CNC LATHE LX20 1 No. 2016
4 GEE DEE WEILER CNC LATHE LINEAR TURN 32 3 Nos. 2017
5 JYOTHI CNC LATHE DX2003A FANUC 1 No. 2017
6 DRILLING MACHINE – NC CONTROL ARROW 1 No. 2020
7 TAPPING MACHINE – HIGH SPEED ITAKU 1 No. 2018

Specialised Process Partners

Part Former Machine

MACHINE 5 STATION BOLT/ PART FORMER
CAPACITY 220 TONS
FASTENERS M8 TO M18
MAX DIA UPSETTING 30MM
MAX LENGTH 150MM
MACHINE 5 STATION PART FORMER
CAPACITY 500 TONS
MAX DIA UPSETTING 30MM
MAX LENGTH 85MM

Vertical Cold Forging - Press

MACHINEHYDRAULIC PRESS
CAPACITY150 TONS
MAX DIAUPSETTING 36MM
MAX LENGTH165MM
MACHINECLOSED FRAME COLD FORGING PRESS
CAPACITY200 TONS
MAX DIAUPSETTING 50MM
MAX LENGTH250MM

 

Heat Treatment

  • HARDENING AND TEMPERING – SQF
  • INDUCTION HARDENING
  • CARBONITRIDING
  • NEUTRAL HARDENING

Plating

PROCESS TYPE

  • AUTOMATED BARREL PLATING
  • AUTOMATED VAT PLATING

PROCESS

  • ZINC PLATING – TRIVALENT – ACID ZINC – ALKALINE ZINC – IRON ZINC YELLOW & BLUE
  • ZINC PLATING – HEXAVALENT – ACID ZINC – ALKALINE ZINC – IRON ZINC YELLOW, GREEN< BLACK
  • ELECTRO NICKEL PLATING – AUTOMATED PROCESS